lot_progress_10_8_04
|
|
Status 10/8/04 : well I do not have allot of time to do this update... so here are the pictures... above and bellow is pictures of the insulation going into the house... as you can see we have all the electric installed... but let me tell you working with Residential electric company SUCKED.... I will never ever give these guys a good recommendation... the change of work... pass the buck and do a crappy job... 1 week after they have left i am still going behind them and fixing their shit... and they always blame ... either me... or the fixture... or some other contractor... was just a horrible experience with them... so I recommend you stay clear of this company... We have installed all the kitchen cabinets ... and during the cabinet instillation I had to take a break and head to the hospital so they could remove the molding I just mounted to my thumb... Oh how much fun it is to have the new fad in body piercing... be the first on your block with a pierced thumb... The living room was sheet rocked... The living room bathroom tiled... Tile around the master bathtub... Master shower tiled... vanity in master bathroom installed.. Birck is completed on the house... Septic tank being installed... Septic drain field....
Ok well my dolphins lost Yet Again ... and it is time to work... later all .. sorry for the crappy update....
Later for now
Mark... |