lot_progress_7_26_04
Home ] Lot progress 4/12/04 ] Lot progress 5/22/04 ] Lot progress 5/29/04 ] Lot progress 6/7/04 ] lot_progress_6_18_04 ] lot_progress_6_26_04 ] lot_progress_7_6_04 ] lot_progress_7_18_04 ] [ lot_progress_7_26_04 ] lot_progress_8_7_04 ] lot_progress_8_16_04 ] lot_progress_10_8_04 ] lot_progress_2_20_05 ] PUPS_2_20_05 ] Cooper Holidays ] Building Outline ] Plan images ] Appliances ] Email ] GE appliances ] home depot ] lowes ] Google ]

 

Home
Lot progress 4/12/04
Lot progress 5/22/04
Lot progress 5/29/04
Lot progress 6/7/04
lot_progress_6_18_04
lot_progress_6_26_04
lot_progress_7_6_04
lot_progress_7_18_04
lot_progress_7_26_04
lot_progress_8_7_04
lot_progress_8_16_04
lot_progress_10_8_04
lot_progress_2_20_05
PUPS_2_20_05
Cooper Holidays
Building Outline
Plan images
Appliances
Email
GE appliances
home depot
lowes
Google

Status 7/26/04 : Well not allot of images to show you this update... but we have done alot of work... but mostly been covered in other updates... the framing is almost completed... the plumbing stack out is completed... we are working on the columns .. hardy board siding... and locating a mason... HAVC and Electrical should go in this week... so lets get to the pictures...

Front of the house with Tyvek and flashing installed..

The first picture just shows the front of the house with flashing installed and the tyvek material in place... we hope they will have the siding in this week...

The East gable is finaly sheathed...

Finally have the East gable end sheathed... the picture will be in next updated.. but they also have this end sided with hardy board now...

Rear of the house with tyvek and flashing..

The rear of the house with Tyvek and flashing... I know ... boring ... but hey is is progress...

The West gable with hardy board siding....

This is the West side of the house ... it starting to take shape... 

Framing the hallway up to the second floor...

Belive it or not they still have some framing to do in the house...

Another view of the stairway with the second floor framing..

They finally have the stairway roughed in...

This is the underside of the plumbing rough in for up stairs bathroom..

I know it is not exciting but this is the rough in for the future bathroom to be installed on the second floor...

Some of the plubming stackout for a bathroom..

Yet more exciting plumbing stack out .... for one of the downstairs bathrooms...

Access way to the pump for the whirlpool...

Ooo ... Ooo... The access way to service the new whirlpool... I know ...Yawn... Next pic please..

The new whirlpool tub...

This is the new 2 seat whirlpool we have in the Master bathroom... she gets the window and stairs .. i will mount a TV on the other end to keep up on my sports...

Plumbing for the whirlpool...

Just a quick view of the plumbing for the new whirlpool tubs...

Plumbing stack out for the master shower..

It is hard to see... but this is the stack out for the master shower... it should be really nice when finished...

Tub in the family room bathroom..

Yet another bathroom picture...

Kaylynn's and guess bathroom...

Yet another bathroom picture...

And a picture for the Grandparents... no she is not tired she just drank 3 diet colas...

And finally a picture for the grandparents of one tired little girl that has had to much caffeine... she feel asleep as soon as she was put in the truck to drive home.... well that is all for now ... lets hope I have some more exciting pictures in the future...

Later for now...

 

Mark...