lot_progress_8_7_04
Home ] Lot progress 4/12/04 ] Lot progress 5/22/04 ] Lot progress 5/29/04 ] Lot progress 6/7/04 ] lot_progress_6_18_04 ] lot_progress_6_26_04 ] lot_progress_7_6_04 ] lot_progress_7_18_04 ] lot_progress_7_26_04 ] [ lot_progress_8_7_04 ] lot_progress_8_16_04 ] lot_progress_10_8_04 ] lot_progress_2_20_05 ] PUPS_2_20_05 ] Cooper Holidays ] Building Outline ] Plan images ] Appliances ] Email ] GE appliances ] home depot ] lowes ] Google ]

 

Home
Lot progress 4/12/04
Lot progress 5/22/04
Lot progress 5/29/04
Lot progress 6/7/04
lot_progress_6_18_04
lot_progress_6_26_04
lot_progress_7_6_04
lot_progress_7_18_04
lot_progress_7_26_04
lot_progress_8_7_04
lot_progress_8_16_04
lot_progress_10_8_04
lot_progress_2_20_05
PUPS_2_20_05
Cooper Holidays
Building Outline
Plan images
Appliances
Email
GE appliances
home depot
lowes
Google

Status 8/7/04 : Well the race is on... we have 60 days to finish the house... so lets get down to it... my updates will be short and to the point ... we frankly cause I need to be building and not talking about it... there is a ton of time to chat about it after we are finished ... to the pictures...

Front view of the house...

well the framing is done and the framers are paid...  we also had the painter out and the siding is painted... yes it is a grey fog color with white trim...

West end of the house...

west end of the house.. got to remind the painters to take their masking paper down...

French doors...

the French doors will be painted white... I think they look better than with the grey..

Back porch Furred out.. ready for Vinyl...

the column are installed and painted... the porches are furred out for vinyl...

Front porch Furred out.. ready for Vinyl...

I have also blocked both porches for the fans that will be installed..

Painted Garage Floor...

Oh I also took some time to put the first coat of paint on the Garage floor...

New Saw Horses...

I did take some time to build some saw horses ... got tired of barrowing Neal's..

Knee wall in Kitchen....

I got tired of waiting for someone to frame in the Knee wall for the breakfast bar... so I got off my ass and did it myself...

Upper part of A/c Closet...

HAVC is now roughed in ... as well as the electrician is doing his rough in...

Lowwer part of A/c Closet...

The lower section of the AC closet...

Duct Work...

Duct work for the HAVC....

Duct Work...

More Duct work....

Duct Work...

And yet more duct work...

Bathroom vent line...

This is a picture of one off the bathroom vents thru the roof...

Asphat shingles stacked on the roof...

We are waiting on the vinyl guys to finish to place asphalt shingles... the first vinyl guys quit so we will have a new crew on Monday... we also have had the bricks delivered... tile comes in on Tuesday... We hope to have sheet rock going up in the next 2 weeks... but we will see... have insulation and finish the wiring... a lot to do... very little time left to do it ... well that is all for now ... look for the next update coming soon...

 

Later for now ...

Mark..